FlowsBook a callSign inCreate free accountSign up
Workflows by industry

Pool service route planning: build weekly rounds that hold together

Group pools into tight day-by-day rounds, keep each customer on the same weekday, order the stops, and add real time on site so a technician's day fits.

Part of the guide Workflow automation

By the xMap team · · 5 min read

Good pool service route planning has two stages: first give every pool a fixed day, grouped so that each day's pools sit close together, then put each day's stops in the shortest driving order. Do them in that order. A perfectly sequenced Tuesday still wastes hours if Tuesday's customers are scattered across the city, and reshuffling days every week upsets the water chemistry your customers pay you to keep steady.

This guide is for owners and office managers of pool cleaning and maintenance companies, from one van to a small fleet. It walks through a week's plan for a made-up firm and shows how to have it rebuilt whenever your customer list changes.

Why a pool round is different from other routes

A courier's stops change every day. A pool round is a standing appointment. Chlorine, pH and filter condition drift at a predictable rate, so a pool serviced on Monday should be serviced on Monday next week too. Moving it to Friday and back leaves a gap of nearly two weeks at the worst possible time in summer.

That shapes the whole problem:

  • Days are sticky. You redraw them a few times a year, not weekly.
  • Time on site dominates. Saving driving matters, but only an honest figure for the time at each pool tells you whether the day fits.
  • Frequency varies. Weekly in the warm months, fortnightly or monthly in winter, and some customers stay weekly all year.
  • The van is a small chemical store. Refill trips to the yard and safe handling rules limit how far a route can stretch.

A worked example: 80 pools in Brisbane

Take an invented company with two technicians, Ana and Tom, and 80 weekly pools around Brisbane. All numbers in this example are made up. Each works Monday to Friday, so there are 10 technician-days, which means 8 pools a day each if the work is shared evenly.

The owner's old plan grew customer by customer, so Ana crosses the river three times on a Wednesday. To redraw it, she splits the 80 pools into 10 compact groups, one per technician-day, and then orders each group from the yard and back.

RoundPoolsDriving (min)On site at 25 min eachWorking day
Ana Monday8952004 h 55
Ana Tuesday81302005 h 30
Tom Monday81102005 h 10
Tom Friday81752006 h 15

Four of the ten rounds, invented for illustration. Working day is driving plus service time.

The last column is the one that matters. Tom's Friday is an hour longer than his Monday because its pools lie on the outer suburbs. With that in view, the owner moves one far pool to a neighbouring round, or accepts the longer day and keeps Friday free of callbacks. Either way it is a decision made on paper instead of discovered at 5 pm in a customer's driveway.

Build the plan with an AI employee

In xMap Flows the work is a few linked blocks. It is a simple example of an AI employee for field operations.

  1. Upload your customers to My data: name, address, position, service frequency and any notes you are happy for a technician to read.
  2. My data brings the table into the flow.
  3. Filter keeps the pools due this cycle, for example weekly ones plus the fortnightly group for week A.
  4. Split by territory: choose People I name and enter a name for each technician-day, such as Ana Monday, Ana Tuesday, through to Tom Friday. It shares the pools out evenly by area and writes the name into each one's owner field.
  5. Route planner: start from your yard, One route for each rep using the owner field, By car, Come back to the start on. Each stop gets its visit order, the minutes and kilometres from the stop before, the route's totals and a directions link.
  6. Calculated field: add your service time, for example working minutes = route minutes + stops x 25.
  7. Google Sheets or Email: one row per stop, ready to sort by round and order.

Route planner handles up to 50 stops in a route, far more than a technician visits in a day. Its times are travel on the roads in usual traffic, and it adds no time at the stops, which is why the Calculated field step is there.

With rounds fixed, a weekly flow on a Schedule for Friday afternoon can reorder each day to include new customers and send every technician next week's list. The template Next week's jobs planned around the weather adds the forecast, handy when a storm will fill pools with debris and turn a routine Monday into extra cleaning.

Mistakes pool companies make with routes

  • Rebuilding days every week. The shortest possible route is not worth an erratic service interval and customers who never know when to expect you.
  • Using one service time for every pool. A small plunge pool and a large pool with a spa and a salt system are different jobs. Keep a minutes column per customer if your range is wide.
  • Forgetting the winter plan. When many customers drop to fortnightly, two half-empty rounds should merge. Plan a summer and a winter version, and tell customers before their day changes.
  • Ignoring access. Locked side gates, dogs and homes where someone must be in all constrain the order. Mark those stops and nudge them after the route is drawn.
  • Putting gate codes in a shared sheet. Routes get forwarded. Keep alarm and gate codes in your job system, and leave them out of anything a flow emails.
  • Leaving no slack for green pools. One algae callback can eat an hour. Keep a lighter day or a buffer in each week.

Growing into new suburbs

Route density is also a sales plan. Once the rounds are on a map, gaps stand out, and a leaflet drop or a local advert around your tightest round adds pools that cost almost no extra driving. If you add a third technician, redraw once with 15 technician-days, then keep the days steady again.

Questions

How many pools can one technician service in a day?

It depends on pool size, service time and driving between stops. Work it out for your own rounds by adding the route's driving minutes to your time per pool, rather than using a rule of thumb.

Should pools stay on the same day every week?

Yes, wherever possible. A steady interval keeps the water chemistry predictable and tells customers when to expect you, so change days only when you redraw rounds for a season or a new technician.

Does Route planner include time spent at each pool?

No. It gives driving time and distance between stops, so add your service time with a Calculated field to see the true length of the day.

Can I plan fortnightly and weekly customers together?

Yes. Keep the frequency and a week A or B label in your table, and use Filter to pass on only the pools due in the cycle you are planning.

Templates that do this

Read next

More on workflows by industry · Every article · Templates

Put it to work

An AI employee in xMap Flows does this on live data, on its own timetable. Start from a template or describe it in plain words.