How sustainability teams map EV charging near offices for staff who drive electric
Before promising staff they can switch to an electric car, check where they could charge. How to count public chargers around each office and spot the ones with none.
Part of the guide Workflow automation
A sustainability team maps EV charging for staff by taking the list of office addresses, counting the public charging stations within a short walk of each, and marking the offices where charging is thin or slow. In xMap Flows the EV charging block does the counting from a public register of charging stations: each office comes back with how many stations and charge points are near it, how many are fast, the most powerful one and the nearest. A monthly AI employee keeps the map current and tells the team when an office gains or loses chargers nearby.
This article is for sustainability, workplace and facilities teams writing a travel plan, a salary-sacrifice car scheme or a commuting section of an emissions report. It explains what to measure, how to read the counts, a worked example and the flow.
Why charging near the office matters to a travel plan
Most people who drive electric charge at home. The ones who cannot, because they live in a flat or park on the street, need somewhere else, and the workplace is the obvious answer. Before a company encourages staff to switch, it should know three things for each site:
- Is there public charging within a walk? If a driver can plug in at a car park five minutes away and walk in, the office does not need its own chargers on day one.
- Is it the right kind? A slow charger suits a full working day; a fast one suits a quick top-up at lunch. Both count, but for different people.
- Who runs it? A single operator nearby means one membership or app; several mean choice, and sometimes better prices for staff.
The answers decide where to spend: install workplace chargers at the offices with nothing around them, and negotiate with a nearby operator where there are plenty.
What to count, and how to read it
Run the block with Each incoming place, with counts, so every office goes on with fields added. The ones that matter for a travel plan:
| Field | What it tells you | How to use it |
|---|---|---|
| ev_stations, ev_points | Stations and charge points within the distance you set | Points matter more than stations: one site with eight points beats three with one each. |
| ev_fast_stations, ev_max_kw | How many are fast (50 kW or more) and the highest power nearby | Fast charging nearby suits staff who visit clients by car during the day. |
| ev_nearest, ev_nearest_km | The nearest station and its distance | The walk your staff would make, in the worst case. |
| ev_operators | The main operators around the office | Who to call about a staff arrangement. |
Fields added by the EV charging block to each place it receives.
Choose the distance as a walk, not a drive. Within 500 m or 1 km is right for most offices: further than that, a driver will not leave the car and walk in. For a business park outside a town, 2 km may be fair if there is a shuttle.
A worked example: an engineering firm with six offices
This example is made up. An engineering firm has offices in Amsterdam, Lyon, Toronto, Melbourne, Bangalore and Sao Paulo, and is launching an electric car scheme. The sustainability lead uploads the six addresses as a table and wants a page for the board: which offices are ready, which need chargers, and what the firm should do at each.
- Upload the offices with their addresses to My data; each gets a position from its address.
- Count stations within 1 km of each office, any power, and a second count of fast ones only.
- Mark each office: ready with four or more points within 1 km, partly with one to three, needs chargers with none.
- Ask xMap AI to write two sentences per office: what is nearby and what to do, without inventing anything not in the counts.
- Make a PDF report with a map and the table, and email it to the sustainability lead each month.
In this made-up run, say the two city-centre offices come back ready with several operators each, the business park office comes back partly ready with one slow station, and one office comes back with none within a kilometre. The board's decision is then concrete: install chargers at one office, sign an arrangement with a nearby operator at another, and say nothing more at the rest because staff already have options.
How to do it with an AI employee
The monthly flow, block by block:
- Schedule: the first Monday of each month.
- My data: your offices, sites or depots.
- EV charging: each incoming place, with counts, within 1 km.
- Calculated field: a readiness label from ev_points, such as ready, partly or needs chargers.
- xMap LLM: a short note per office in plain words.
- Show on a map: offices coloured by readiness.
- Make a report: a PDF with the summary, the table and the map, emailed to the team.
What lands in the inbox is a branded PDF once a month: a line per office with its station and point counts, the nearest station and how far it is, the readiness label and the note. To hear only when something moves, put What changed after the counting block, set to watch the ev_points field, so the team hears when an office gains or loses chargers nearby instead of reading the same table every month.
For depots and vans rather than staff cars, the EV charging around my depots template starts from fast chargers. To look at a whole city's network, Charging network report for my cities lists every station with its operator and power.
Things to get right
- Use the entrance, not the building centre. On a big campus the car park entrance can be several hundred metres from the middle of the site. Put the address staff actually drive to.
- Check status. Each station carries its last reported status and when it was last confirmed. An old confirmation is worth a call before you rely on it.
- Separate public and private. A charger in a hotel car park may be for guests only. The usage field says who may use it.
- Do not promise prices. The data says where stations are and how powerful, not what a charge costs. Prices are a conversation with the operator.
A charging map is one input to the travel plan, next to where staff live and how they commute. Done once a month, it stays true as networks grow, and it gives the sustainability team a dated record of what was available when each decision was made.
Questions
How far from the office should a charger be to count?
Most teams use 500 m to 1 km, a walk of up to about twelve minutes. Further than that, staff tend not to leave the car and walk.
Does the block know if a charger is free right now?
No. It gives each station's last reported status and when it was confirmed, not live occupancy. Use it to plan, not to send staff to a free bay.
Can it count chargers in a whole city instead of around offices?
Yes. With Area of interest, it lists every station inside each city or area, up to the block's limit, with the fast ones and the nearest first.
What if an office shows no stations at all?
First check the address is right, then widen the distance once. If it is still zero, the office is a candidate for workplace chargers, but confirm on the ground: coverage of the register varies by country.