FlowsBook a callSign inCreate free accountSign up
Workflows by industry

How fish processors plan the day's collection runs from the landing points

Fish collection route planning for processors: which landing points to visit, in what order, around the wind at sea and the road closures, set out each morning.

Part of the guide Workflow automation

By the xMap team · · 5 min read

Good fish collection route planning starts from a simple list, the landing points and fish farms that will have product today, and puts them in the best order from the plant, after checking two things that can wreck a run: wind that keeps the boats in harbour, and closed roads between the quays. Done each morning before the trucks leave, it gives every driver a route with the order of stops, the distance and minutes between them, and a note on which quays may have nothing to load.

This guide is for seafood processors, fish wholesalers and co-operatives that send refrigerated trucks to several harbours, auction halls or farm sites a day. It covers what makes fish runs different from ordinary deliveries, the inputs a planner needs, a made-up morning on a stretch of the French Atlantic coast, common mistakes, and the AI employee that prepares the plan.

Why fish runs are not like other rounds

A bakery delivery runs to a fixed list every day. A fish collection run changes with the sea. When the wind is up, small boats stay in, and the quay that usually fills half a truck may have a few crates or none. When a big catch comes in, one harbour needs two trucks. Time matters more than distance too: fish loses value with every hour out of ice, and auction halls sell at set times.

So the plan has to be rebuilt every morning from what is true today, not copied from last week. That is tedious by phone and spreadsheet, and it is exactly the kind of routine a flow handles well.

The inputs a planner needs

  • The stops. Landing points, auction halls, farm cages with a shore base, and ice or cold-store suppliers, kept in a table with their position. The My data block brings it in.
  • Who is landing. Many processors get a call or message from skippers. A column in the same table, filled each morning, says which quays expect fish.
  • The wind and rain. The Weather forecast block adds the forecast to each stop: the strongest wind, rain expected and a one-line summary, day by day or hour by hour.
  • The roads. Traffic incidents checks around each stop for road closures, roadworks and other incidents right now, and adds how many are nearby and the closest one.
  • The order. The Route planner puts the stops in the best visiting order from the plant, as one route, one per driver, or shared between a set number of trucks.

A morning on the coast, made up

Picture a processor near Lorient in Brittany with two trucks and nine regular stops along the coast, from small quays to an auction hall. At 04:30 the flow reads the table, sees seven stops marked as landing, checks the forecast and the roads, and shares the stops between the two trucks.

StopLanding todayWind noteRoad noteTruck and order
Auction hallYesCalmNoneTruck 1, stop 1
Small quay AYesGusty after noonRoadworks 400 mTruck 1, stop 2
Quay BYesCalmNoneTruck 1, stop 3
Farm base CYesCalmNoneTruck 2, stop 1
Quay DNoStrong windNoneLeft out

An invented morning with a few of the stops, to show what the drivers receive. Not real places or forecasts.

The planner moved small quay A earlier in the run because the wind picks up after noon and late boats may not land there at all. Each driver got the stops in order with the minutes between them and a directions link to follow on the phone, and the dispatcher saw both routes on one map before anyone started an engine.

Mistakes that cost a morning

  • Planning on last week's list. The quays that matter change with the weather and the season. Read who is landing every day.
  • Ignoring roadworks near small harbours. Coastal roads often have one way in. A closure there can add a long detour.
  • One truck for everything. On a big day, sharing the stops between trucks keeps fish colder than one very long run.
  • No ice stop. Put the ice or cold-store supplier in the table, so the plan can add it when a run is long.

The AI employee that writes the plan

Built once, it runs before dawn and sends each driver and the dispatcher their part:

  1. Schedule: every day at 04:30, in your time zone.
  2. My data: the stops table with its landing column.
  3. Filter: only stops marked as landing today.
  4. Weather forecast: today's wind and rain at each stop.
  5. Traffic incidents: road closures and roadworks within a few kilometres of each stop.
  6. Route planner: from the plant, shared between your trucks, back to the plant.
  7. xMap LLM: one line per stop on the wind and the roads.
  8. Email to each driver, with a map for the dispatcher.

Related templates: road closures from the port to the fish market watches the main road, go or stay: wind at sea for small boats is the skipper's side of the same forecast, and ice suppliers and cold stores near landing sites builds the list of ice stops. For flows that run on their own each day, see workflow automation.

Questions

How many stops can one plan hold?

The Route planner orders up to 50 stops in a route. A processor with more stops usually splits them between trucks, which the block can do itself.

Does it know which boats are at sea?

Not from the plan above. A separate flow with the Ships block can show vessels at sea off a coast where coverage is good, but most processors rely on the skipper's own message.

Can drivers see the route on their phone?

Yes. Each stop comes with a directions link for its part of the route, so the driver taps it and follows the turns.

What if the routing service cannot plan a route?

The block then orders the stops on straight lines and estimates the distances and times, and the email says the route is an estimate.

Templates that do this

Read next

More on workflows by industry · Every article · Templates

Put it to work

An AI employee in xMap Flows does this on live data, on its own timetable. Start from a template or describe it in plain words.