FlowsBook a callSign inCreate free accountSign up
Workflows by industry

How fleet managers fit public charging stops into the day's routes

Plan EV charging stops for fleets route by route: order the day's drops, find fast public chargers beside the stops, and put a top-up where the van has time.

Part of the guide Workflow automation

By the xMap team · · 5 min read

The practical way to plan EV charging stops for fleets is to work from the route, not from a map of chargers. Put the day's drops in order, see how far each van drives and when, then look for fast public chargers within a short detour of the stops that fall around the point where the battery will need help. A top-up booked beside a stop where the driver already pauses costs far less time than a detour planned after the warning light comes on.

This is for fleet and transport managers running electric vans or small trucks on routes that do not always return to the depot in time to charge. It covers the questions to settle before planning, a made-up day of routes, the errors that strand vehicles, and a flow that checks every route each morning before the vans leave.

Settle these before you plan

  • The usable range in your conditions. Not the brochure figure: the distance your vans actually cover on a full charge with a full load, in winter and summer. Your telematics or the drivers' logs hold it.
  • The margin you keep. Most fleets never plan to arrive below a set share of the battery. Agree the figure once, and plan to it every day.
  • The power that is worth stopping for. A 7 kW post adds little in a 20 minute stop. For a top-up on a working route, fast stations of 50 kW or more are usually the only ones worth a detour.
  • Which networks your drivers can pay at. A station the fuel card does not cover is not a station for planning.

Why the route comes first

A list of every charger in a city is long and mostly useless to a driver. What matters is the handful within a kilometre or two of the stops on today's route, and only those that fall at the right moment in the day. A van on a 140 km route with a 200 km usable range may never need a public charger in summer, and need one every day in January. A van that starts the day at 60% because it came back late does not care about chargers near its first five drops; it cares about the ones near drops eight to twelve.

So the order is: plan the route, read off where each stop falls in distance and time, then look for chargers around the stops that matter.

A made-up day of routes

Say a parcel firm in the Lyon area runs 14 electric vans, each with about 35 drops a day. The fleet manager wants, every morning, a note for each van that runs further than its range allows without a top-up.

  1. The drops for each van are put in order from the depot, which gives each stop its leg distance and the time it is reached after leaving.
  2. Each route's total distance is compared with the usable range for the day, minus the margin. In this invented case, 3 of the 14 vans are over.
  3. For those 3 vans, fast stations of 50 kW or more within 2 km of each stop are counted, with the nearest one and how far away it is.
  4. For each van, the stop where the driver has driven about two thirds of the route, and that has a fast station close by, is chosen for a 25 minute top-up.
  5. Each of the 3 drivers gets the stop, the station and the reason before leaving the yard.

The figures are made up. The method is what counts: the charger list is read only for the vans and stops that need it.

Errors that strand vehicles

  • Planning on straight-line distances. The chargers are found within a distance of each stop as the crow flies. A station 1.5 km away across a rail line can be a 10 minute drive. Look at the shortlist on the map.
  • Forgetting that route times leave out the stops. Route planner gives driving times for usual traffic; the minutes at each door are not added. Add them yourself when you judge where the driver will be at midday.
  • Picking slow posts. Filter on power. A station that charges at 7 kW is fine overnight at a depot and almost useless in a lunch break.
  • Ignoring where vans wait anyway. The best top-up is beside a stop with a long dwell, such as a big retail customer with a loading queue.
  • Planning once. Routes change daily. A plan made in the spring will not suit the winter range.

A morning check with an AI employee

In xMap Flows this runs before the vans leave and lands in the transport office's inbox. It is a typical job for an AI employee for field operations.

  1. Schedule: every working day at 05:30, in the depot's time zone.
  2. My data: today's drops, with a van field and positions, from a table the planning system updates.
  3. Route planner: one route for each van, from the depot, by car. Each stop gets visit_order, leg_km, arrive_after_min, and its route's route_km and a directions link.
  4. Filter: keep the stops of routes whose route_km is above the day's planning range.
  5. EV charging: around each incoming place, within 2 km, 50 kW or more, passed on as counts: ev_fast_stations, ev_nearest, ev_nearest_km and ev_max_kw.
  6. xMap LLM, on the whole list: for each van, pick one stop past the middle of its route with a fast station close by, name a second station, and write two lines for the driver.
  7. Email: one message to the transport office with the vans that need a top-up, the stop, the stations and a map.

Vans within their range are not mentioned at all, so on a mild day the email may be empty, which is the point. Send the driver's lines on to each van by your usual messaging, or use a WhatsApp block to send them straight from the flow.

Questions

Do I need a list of every charger in the city?

No. Look only around the stops of routes that need a top-up. Counting fast stations within a short distance of each stop is enough to choose one.

How far from a stop should a charger be?

Close enough that the detour is shorter than the time the top-up saves. Start with 1 to 2 km in a city and widen it only where nothing is found.

Are the charger details always up to date?

Each station carries its status as last reported and the date it was last confirmed. Name a second station in every plan in case the first is busy or down.

Can this plan charging at the depot too?

Depot charging is a separate question about the power on site. This method is for the days when a van cannot get back to it in time.

Templates that do this

Read next

More on workflows by industry · Every article · Templates

Put it to work

An AI employee in xMap Flows does this on live data, on its own timetable. Start from a template or describe it in plain words.