FlowsBook a callSign inCreate free accountSign up
Workflows by industry

How electricity distributors prepare for heat waves, district by district

Heat wave alerts for utilities: the hottest days ahead in each district, a plain note for the control room and crews, sent only when the forecast crosses your line.

Part of the guide Workflow automation

By the xMap team · · 6 min read

Electricity distributors prepare for heat waves by reading the temperature forecast for every district they serve several days ahead, flagging the districts and days that cross a line they set, and telling the control room, field crews and customer teams early enough to act. Heat wave alerts for utilities work best when they are per district rather than for the whole city, because a hot inland suburb and a breezy coastal one load the network very differently.

This guide is for network operators, distribution companies, municipal utilities and the energy retailers that share their customers. It covers why heat strains a distribution network, how to set the threshold, a made-up example in Ahmedabad, the mistakes to avoid, and an AI employee that sends a short, checked note each morning only when it matters.

Why heat strains a distribution network

Air conditioning pushes demand up in the afternoon and keeps it high into the night, when homes cool down after work. At the same time, transformers and cables carry less current safely when the air around them is hot, and they get little chance to cool overnight if nights stay warm. The result is a network asked to do more with less margin, often several days in a row.

For the people who run it, a heat wave means a set of decisions that take time:

  • Control room. Plan switching, check that feeders known to run hot have a backup path, and agree what load can be shed and where if it comes to that.
  • Field crews. Put more crews on call, move spares closer to the hottest districts, and schedule outdoor work in the cooler hours.
  • Customer teams. Prepare messages about saving power at peak, and check the list of customers who depend on power for medical equipment.
  • Retail and trading. Expect higher demand and plan purchases.

Two or three days of warning turns most of these from a scramble into routine.

Setting the line for each district

The Weather forecast block brings forecasts from national weather services for up to 16 days. For a city, a point or each area of an Area of interest, it lists the forecast day by day (the day's highest and lowest temperature, rain, wind and UV) or hour by hour, one row each. Name each district in the Area of interest, or draw it on the map, and you get one row per district and day.

The threshold is yours to choose, and a single number for every district is rarely right. A sensible way to set it:

  1. Look at the days last summer when the network was under real stress and note how hot they were.
  2. Set the line a little below that, so the alert comes before the stress, not with it.
  3. Add a second, higher line for a full heat plan, so crews can tell a warm day from a dangerous run of days.
  4. Watch the nights too: a low temperature that stays high means equipment does not recover, so an alert on warm nights is often as useful as one on hot days.

A Filter on the highest temperature keeps only the rows over the line. The Calculated field block can mark the level in words, such as watch or plan, from the two lines.

Who lives in the hottest districts

Heat hits some customers harder than others. The Demographics block counts the residents of each district and splits them into age groups, including people aged 60 and over. Population figures exist only in some countries, among them India, Egypt, Thailand, France, Canada and Australia, and not in the United Kingdom or the United States. Where they exist, a district that is both very hot and home to many older residents goes to the top of the customer team's list.

A worked example in Ahmedabad

The utility here is made up. It serves a set of districts across the city and wants a note in the control room by 06:00 whenever the coming five days look dangerous.

  1. At 05:30 the flow reads the five-day forecast for each district by name.
  2. A Filter keeps district and day rows with a highest temperature over the utility's first line.
  3. Demographics adds the residents and the number aged 60 and over in each district that passed.
  4. xMap AI writes the note: which districts, which days, how hot, whether nights stay warm, and one sentence for crews and one for the customer team.
  5. The note goes to the control room by email and to the crew channel in Slack. On days with nothing over the line, nothing is sent.

In a typical early summer week the note might say that three western districts cross the first line from Thursday, one crosses the second line on Saturday, and the warm nights start on Friday. The crews then know where to stage spares two days ahead.

Mistakes to avoid

  • One forecast for the whole city. A city average hides the districts that will run hottest.
  • An alert every day of summer. If the line is too low, the note arrives daily and stops being read. Raise it until it fires on days that matter.
  • Days only, no nights. Warm nights are when equipment cannot cool. Read the lowest temperature as well as the highest.
  • Trusting day 12. Forecasts far ahead are rough. Use the first five days for decisions and the rest only as a hint.
  • Population where there is none. In countries without population figures, use your own customer table instead, loaded with My data.

How to do it with an AI employee

In xMap Flows this is an AI employee that reads the forecast every morning and writes only when the heat calls for it. The blocks:

  1. Schedule: every day at 05:30 in the service area's time zone.
  2. Area of interest: your districts, by name or drawn.
  3. Weather forecast: Area of interest, 5 days, Temperature, day by day.
  4. Filter: the highest temperature at or above your first line.
  5. Demographics where your country has population figures.
  6. xMap LLM on the whole list: the note for the control room, crews and customer team.
  7. Email to the control room, and a Slack post to the crew channel.

What lands in the inbox is a short note headed by the hottest district and day, followed by a table of every district over the line. The heat ahead note for the grid control room template is this flow ready-made; heatwave water demand does the same for water companies, and cooling centres for the heat wave shows the city's side. See the energy and utilities page and the field operations guide for more.

Questions

How far ahead can the forecast go?

Up to 16 days. For operational decisions the first five days are the useful ones; later days are only a hint.

Can I get a forecast for each district, not just the city?

Yes. Name each district in the Area of interest, or draw it, and the Weather forecast block lists one row per district and day.

Will it send a message every day?

Only if you want it to. A Filter on your temperature line means nothing is sent on days when no district crosses it.

Does it know which customers need power for medical equipment?

No. Keep that list in your own systems or in My data; the flow can match the hot districts against it.

Are population figures available everywhere?

No. They exist in some countries, such as India, Egypt, France, Canada and Australia, but not the United Kingdom or the United States.

Templates that do this

Read next

More on workflows by industry · Every article · Templates

Put it to work

An AI employee in xMap Flows does this on live data, on its own timetable. Start from a template or describe it in plain words.