A wind forecast for maintenance crews, sent to every turbine site before the climb
How wind farm operators get a short note per site each dawn: the wind hour by hour, the calm windows for climbing, and which crews should plan ground work instead.
Part of the guide Workflow automation
A useful wind forecast for maintenance crews is short, early and per site: one note for each wind farm, in the supervisor's inbox before the vans leave, that says which hours look calm enough to climb, which do not, and what to do with the day if the answer is no. An AI employee can write that note every morning by reading the forecast for each site hour by hour, comparing it with your own climbing limit, and emailing the result.
This is for operations and maintenance managers at wind operators, independent service companies that look after turbines for several owners, and the planners who book cranes and technicians. It covers what the note should hold, how to set it up block by block, a worked example with made-up sites, and the limits of a forecast that every safety lead will want written down.
Why a per-site note beats a regional forecast
Wind farms sit where the wind is strong, which is exactly why a national or regional forecast says little about them. A ridge in the Scottish Highlands, a shoreline site on Lake Huron in Ontario and a plain in Tamil Nadu can have three different mornings on the same day. Crews that plan from a phone app tend to check one spot, at one moment, and find out on site that the afternoon turned.
A planner needs something else: every site the company services, side by side, read at the same hour, with the decision already worked out against the company's own rule. That turns a morning of phone calls into a two-minute read.
What the morning note should say
- The site and today's verdict. Climb, climb before a set time, or ground work only.
- The calm window. The first and last hour in which the forecast stays under your limit, so the team knows how long the job may run.
- The strongest wind of the day, in km/h, with the hour it is expected.
- Rain and temperature when they matter for the task: a gearbox oil change and a blade inspection do not care about the same things.
- Tomorrow in one line, so a job that cannot happen today can be moved rather than lost.
Keep it to those five lines a site. Supervisors read it in a cab or a yard, often on a phone, and anything longer gets skipped.
Setting it up as an AI employee
The Weather forecast block gives one row per hour for a city, a point or each area of an Area of interest, with the wind speed in km/h, rain and temperature. Drawing each site as a point on the map gives each its own forecast. In order:
- Schedule: every day at 04:30, in the time zone of the sites (one flow per region keeps the hours right).
- Area of interest: each wind farm drawn as a point and named after the site.
- Weather forecast: Hour by hour, 2 days, with Wind, Rain and Temperature ticked.
- xMap LLM on the whole list: told your climbing limit and asked to write the five lines for each site, using only the hours in the rows.
- Email once per run to the supervisors and the planning desk.
If you would rather receive nothing on calm days, add a Filter on the wind field before the xMap LLM step, so only the hours above your limit go through and the email names only the sites with a problem. Many teams prefer the full note every day instead, because a missing email is easy to miss in its own right.
A worked example with made-up sites
Everything below is invented to show the shape. A service company looks after 14 onshore farms for four owners, split across two regions. Its procedure, in this example, stops climbs when the forecast passes 40 km/h at any hour of the planned job, and asks for a review between 32 and 40 km/h. The planner writes that rule into the xMap LLM instructions in plain words.
| Site | Verdict | Calm window | Strongest wind |
|---|---|---|---|
| Ridge North | Climb before 11:00 | 06:00 to 11:00 | 47 km/h at 15:00 |
| Loch Side | Ground work only | None | 52 km/h at 09:00 |
| Moor Gate | Climb | 06:00 to 18:00 | 28 km/h at 13:00 |
| Glen Cross | Review with the supervisor | 06:00 to 14:00 | 36 km/h at 12:00 |
A made-up morning note for four sites. The verdicts follow the example rule above, not an industry standard.
On this morning the planner swaps the Loch Side crew onto a substation check, moves the blade inspection at Ridge North to the first hours, and calls the Glen Cross lead before eight. Nobody drives two hours to stand at the foot of a tower.
What a forecast cannot do
- Forecasts drift. A two-day outlook changes overnight. Read the dawn note, not yesterday's.
- Hours are local. Sites in different time zones belong in different flows, so 06:00 means sunrise at each of them.
- The model writes, it does not decide. Tell xMap LLM to quote the hours from the rows and never to add figures of its own. If the wording ever looks wrong, the hourly rows are in the run, and you can open every row a block passed on.
- Offshore is a different job. Sea state matters as much as wind for crew transfer vessels, and this article does not cover it.
Where it fits with the rest of the operation
The same employee can grow with the team. Road closures near a site matter on the same morning, so a Traffic incidents step can add the closures around each farm to the note. An Approval step can hold a weekly crane booking until the planner says yes. And with the rest of the field work running as AI employees too, the whole set is described on the field operations page.
Start from Week ahead at my solar and wind sites for the weekly plan, or from Wind alert for crane lifts, which already filters the hours above a limit, and change the sites and the rule to your own.
Questions
Can it read the forecast for each of my turbines separately?
It reads one forecast for each site you draw or list. Turbines on the same farm sit close together, so one point per farm, or per section of a large farm, is usually enough.
Does it give gusts at hub height?
No. It gives the forecast wind speed for each hour and the strongest of the day for the location. Use it to plan, and keep your on-site readings and procedure for the decision to climb.
Can the note go to WhatsApp or Slack instead of email?
Yes. Swap or add a WhatsApp or Slack step after the xMap LLM step, so supervisors get the same lines where they already talk.
What if I only want to hear about bad days?
Put a Filter on the wind field before the writing step, so the email lists only the sites and hours above your limit, and nothing comes on calm days.